| |
1. Analysis of the feasibility for installation of a leak monitoring system
for the primary coolant pipelines qualified for LBB – p. 1.320.1 of
PRG’99.
2. Thermal hydraulic analysis of transients for the validation of the
full-scope simulator of Unit 6, KNPP.
3. Detailed Design of FAMOS – KNPP Unit 4.
4. Detailed Design for the decommissioning of KNPP 1&2 – subcontractor
to Belgatom and EWN.
5. Studies for WWER-440/230 – a contract with GRS, Germany.
6. Detailed Design for a new system for SG level control and replacement
of the feedwater control valves, KNPP 3&4.
7. Participation in the Rest Life Time evaluation of KNPP 1÷4 of - subcontractor
to the companies from the CONSART consortium (Siemens and Atomstroyexport).
8. Participation in the reconstruction of the Localization System of KNPP
3&4 with installation of a Jet-vortex Condenser - subcontractor to
Atomstroyexport.
9. Independent evaluation of the safety of KNPP 3&4 – subcontractor
to ENCONET.
10. Elaboration of the upgraded SAR of KNPP 3&4 (in co-operation with
RISK Engineering Ltd.).
11. Detailed Design of FAMOS, KNPP Unit 3.
Projects
1998/1999
|
|
|
|