| |
1. Probabilistic Safety Analysis, level 1, of KNPP 3&4, Part: Thermal
Hydraulic Analyses.
2. Thermal hydraulic and stress analyses of relevant accidents to evaluate
the risk of PTS at KNPP 1&2 – Phare Programme, subcontractor
to Siemens/KWU.
3. Thermal hydraulic and stress analyses of relevant accidents to evaluate
the risk of PTS at KNPP 3&4 – Phare Programme, subcontractor
to Siemens/KWU.
4. Thermal hydraulic and stress analyses of leading transients with respect
to PTS at KNPP 1&2 – evaluation of the efficiency of operators’ actions
- Phare Programme, subcontractor to Siemens/KWU.
5. Feasibility study for the modernization of KNPP 5&6 – subcontractor
to Siemens/KWU.
6. Analysis of selected transients for safety substantiation of the sixth
fuel cycle of KNPP Unit 5.
7. Participation on the development of the Modernization Programme of
KNPP 5&6.
8. Analysis of the consequences of accidents at KNPP 3&4 under a Contract
with RISKAUDIT IPSN/GRS INTERNATIONAL (GEIE).
9. PSA level 1 of KNPP 3&4 - part Thermal Hydraulic Calculations.
10. Feasibility study for installation of a filtered venting system at
KNPP 1÷4 - subcontractor to ABB Combustion Engineering.
11. Feasibility study for modernization of KNPP 5&6 - subcontractor
to Westinghouse Electric Corporation.
12. Six-months’ WANO Programme for enhancement of safety of KNPP
Unit 2
− Item D: Qualification of the Hermetic Rooms (subcontractor to
Empresarios Agrupados, Spain)
− Item F: Amendment of the Operating Procedures (subcontractor to
IVO-International, Finland)
13. EBRD Funding Project for Kozloduy NPP: Safety Parameters Display System
- System Specification.
Participation
in Activities of IAEA
|
|
|
|