1. Probabilistic Safety Analysis, level 1, of KNPP 3&4, Part: Thermal Hydraulic Analyses.

2. Thermal hydraulic and stress analyses of relevant accidents to evaluate the risk of PTS at KNPP 1&2 – Phare Programme, subcontractor to Siemens/KWU.

3. Thermal hydraulic and stress analyses of relevant accidents to evaluate the risk of PTS at KNPP 3&4 – Phare Programme, subcontractor to Siemens/KWU.

4. Thermal hydraulic and stress analyses of leading transients with respect to PTS at KNPP 1&2 – evaluation of the efficiency of operators’ actions - Phare Programme, subcontractor to Siemens/KWU.

5. Feasibility study for the modernization of KNPP 5&6 – subcontractor to Siemens/KWU.

6. Analysis of selected transients for safety substantiation of the sixth fuel cycle of KNPP Unit 5.

7. Participation on the development of the Modernization Programme of KNPP 5&6.

8. Analysis of the consequences of accidents at KNPP 3&4 under a Contract with RISKAUDIT IPSN/GRS INTERNATIONAL (GEIE).

9. PSA level 1 of KNPP 3&4 - part Thermal Hydraulic Calculations.

10. Feasibility study for installation of a filtered venting system at KNPP 1÷4 - subcontractor to ABB Combustion Engineering.

11. Feasibility study for modernization of KNPP 5&6 - subcontractor to Westinghouse Electric Corporation.

12. Six-months’ WANO Programme for enhancement of safety of KNPP Unit 2
− Item D: Qualification of the Hermetic Rooms (subcontractor to Empresarios Agrupados, Spain)
− Item F: Amendment of the Operating Procedures (subcontractor to IVO-International, Finland)

13. EBRD Funding Project for Kozloduy NPP: Safety Parameters Display System - System Specification.


  Participation in Activities of IAEA



 